I have an idea that if we place more than 1 builder at same work than time should be reduced to half or some less for examole if mortar take 6 days to upgrade with 1 builder if we place 2 builder there time should be reduced to 3 days or r days just an idea
I like the idea, but I think there would be some cost to this addition of the builder to the construction, like half the gold you originally paid or something, some kind of cost to get the awesome benefit.