I would like to fully use my resources to build my resources and defenses. In real life, if I have 5 laborers I can assign them to 5 projects or all to 1 project, thereby reducing the construction time.
I have 5 builders and often I have 1 or 2 standing around. Also, I would like to have the ability to load up my builders on one project, to cut down the time.. Say, to complete a critical item before Clan War begins.
This is easy.
When you commit to building the object, place a button on its info menu to add another builder. If there is one available the option will be black, if there isn't one available, then it's grayed out.
The resource remaining time will be divided by the number of builders assigned.. As an example:
2 days original duration with 1 builder
1 day duration with 2 builders
48/3 hours (round up) with 3 builders
12 hours duration using 4 builders
just like builders are committed until completion with one builder, these additional builders are also committed. There is no, I changed my mind I want to load up on this other item.. Rules apply for cancelation of the project with the same penalty, 1/2 the cost. Upon completion or cancelation, you get all of your committed builders back.
Simple, and practical..
(See my other similar entry for lab creations)





